E2DESIGNLAB
  • Home
  • About
  • Services
  • Partners
  • Projects
  • Team
  • Blog
  • Contact
  • Twitter
  • Linked In
  • Email
Gyympie passively irrigated tree cropped
WSUD Design & Construction
Passively irrigated trees

Upper Mary Street Revitalisation

Gympie Regional Council

E2Designlab was contracted by Gympie Regional Council to design passive irrigation solutions for their main street revitalisation.  The project included eight street tree pits and incorporate design solutions for passively irrigated garden beds. The report included detailed depictions of the functional elements for each design along with construction and establishment site sign-off forms and tailored maintenance guidelines.

The design required collaboration with the wider design team to integrate requirements for street lighting, soft landscape and street furniture. The design incorporated elements to protect existing above and below ground infrastructure and adjacent heritage buildings.  

WSUD for Public Realm

Western Precinct Raingarden and Wetland Design

WSUD for Residential Developments

Harcrest Residential Development

Stormwater harvesting

Alma Park Stormwater Harvesting Scheme

Asset Maintenance

Streetscape WSUD Asset Auditing, Maintenance and Rectification

Integrated Community Water Planning

Sydney Science Park Integrated Water Design

Flood Mitigation

Elizabeth Street Catchment Flood Risk Reduction Study

Urban development solutions

Everley Estate Multifunctional WSUD Assets

Stormwater Treatment Design

Bellvista Estate Streetscape WSUD

Linked Harvesting Networks

Eltham Corridor Stormwater Harvesting Network

Stormwater Harvesting

Elsternwick Park Stormwater Harvesting

Priority Stormwater Treatment and Harvesting Design

Priority WSUD Projects: Gordon Barnard Reserve and Macleay Park

WSUD for New Development

Sunbury Hills WSUD Strategy

Large Scale Alternative Water Supplies

Toolern Integrated Water Cycle Management Strategy Designs

WSUD for Schools

St Gregory’s College Water Sensitive Urban Design

Permeable Paving Testing

Infiltration Testing for Permeable Pavement Systems

Channel naturalisation

Small Creek Naturalisation Stages 1, 2 & 3

Retrofit Solutions

Allgas Street Stormwater Disconnection and Riparian Rehabilitation

Stormwater Harvesting for Open Space Irrigation

Royal Park Wetland and Stormwater Harvesting System

Innovative wetland design

Torhaven WSUD and Stormwater Treatment Ephemeral Wetland